 |
Project
Tiger Woods Center and Lance Armstrong Center
at the Nike World Campus, Beaverton, Oregon
Nature
of Facilities
Conference center, performance theater, athletic
center
Client
NIKE, Inc
Date
of Completion
June 2001
Scope
of Work
Design, engineering, fabrication, installation,
training and documentation for audio and visual interactive systems
Challenges/Solutions
ETI's challenge was to reconcile the client's
desire to minimize the visual intrusion of the A/V systems in the
performance theater without compromising the need for world-class
sound. To achieve this goal, ETI worked closely with the architect,
client and manufacturer to carefully select commercially available
components, determine their placement, and design an auditorium sound system to maximize sound performance. ETI also enhanced the A/V
signal routing and connectivity between various meeting rooms. Ultimately,
ETI's engineers produced a system that surpassed everyone's expectations. |
|