Project
Tiger Woods Center and Lance Armstrong Center at the Nike World Campus, Beaverton, Oregon

Nature of Facilities
Conference center, performance theater, athletic center

Client
NIKE, Inc

Date of Completion
June 2001

Scope of Work
Design, engineering, fabrication, installation, training and documentation for audio and visual interactive systems

Challenges/Solutions
ETI's challenge was to reconcile the client's desire to minimize the visual intrusion of the A/V systems in the performance theater without compromising the need for world-class sound. To achieve this goal, ETI worked closely with the architect, client and manufacturer to carefully select commercially available components, determine their placement, and design an auditorium sound system to maximize sound performance. ETI also enhanced the A/V signal routing and connectivity between various meeting rooms. Ultimately, ETI's engineers produced a system that surpassed everyone's expectations.

 
 
 
Employment   :  Webmail   :  FTP   :  Terms of Use