Project
LEGOLAND California
Nature
of Facilities
Theme park
Client
LEGO
Date
of Completion
March 1999
Scope
of Work
Design, engineering, fabrication,
installation and programming of virtually every audio, video and
interactive system in the Park. Includes interactive exhibits,
animated models, an interactive musical fountain, and a participatory
3d digital theatre attraction.
Challenges/Solutions
Due to construction delays, ETI's challenge
was to complete all interactive system design installations in the final six weeks
prior to opening, requiring technicians to work double shifts. An
interactive element of the LEGO Showplace Theater presented a unique
technical challenge: to devise a way to direct the flow of an automated
media show based on audience input. ETI's solution was to program
a computer to calculate audience preference based on measured dB
levels, and use this data to direct the media sequence.
LEGOLAND
Deutschland
ETI is currently in production on LEGO's
next theme park, LEGOLAND Deutschland, opening in May 2002. |